Fluid Hydraulic Design designed the largest new packhouse in the Bay of Plenty, Jace Coolstores. Aquaholics tendered this project and were engaged with Iline Construction. Aquaholics were engaged to complete the Plumbing portion of this project which included cold water reticulation through building for new ablutions, hose down areas and connection to the refridgeration plant. Ablutions consisted of flow and return hot main to feed all basins, kitchen and showers. There were 1.5KM of piping was used in this job. There was also high level stacks to pick up ablutions and condensates from plant room and freezers.
This job began October 2017 and was completed in April 2018.
Job well done by Jarad, Emil, Tom C & team.
Jace Coolstores Project January 2018
Here’s some aerial footage of Jace Coolstores. Form Building & Development are rocking this job. #bestteambestresult😎
Posted by Aquaholics Limited on Wednesday, 24 January 2018